The Region of Peel entrusted ICON Restoration with a critical infrastructure project at their Goreway Drive facility. This comprehensive rehabilitation involved modernizing the underground parking structure while maintaining daily operations for residents and visitors.
The facility’s assessment revealed multiple structural concerns requiring immediate attention. The underground parking structure faced deteriorating concrete surfaces, with visible signs of water damage compromising its integrity. Additionally, the outdated sprinkler system no longer met current safety standards, presenting potential risks to building occupants.
Our team developed a strategic rehabilitation plan that prioritized both safety and efficiency. Working in phases allowed us to maintain partial garage access throughout the project duration.
We began with comprehensive concrete repairs across the facility. Our specialists removed compromised sections and installed new reinforcement where needed. The team applied specialized waterproofing systems to prevent future water infiltration and protect the structure’s integrity. This included:
The second phase focused on modernizing the fire safety infrastructure. Our team carefully removed the existing sprinkler system and installed new equipment that meets current building codes. This upgrade included:
Location: 7340 & 7350 Goreway Dr, Mississauga ON
Status: Ongoing
Completion Timeline: [Timeline]
Need expert parking structure rehabilitation? Contact our team to discuss your facility’s needs and discover how we can deliver lasting solutions while maintaining your operations.